VAPORA Disaster Recovery & Business Continuity

Complete disaster recovery and business continuity documentation for VAPORA production systems.


Quick Navigation

I need to...


Documentation Overview

1. Backup Strategy

File: backup-strategy.md

Purpose: Comprehensive backup strategy and implementation procedures

Content:

  • Backup architecture and coverage
  • Database backup procedures (SurrealDB)
  • Configuration backups (ConfigMaps, Secrets)
  • Infrastructure-as-code backups
  • Application state backups
  • Container image backups
  • Backup monitoring and alerts
  • Backup testing and validation
  • Backup security and access control

Key Sections:

  • RPO: 1 hour (maximum 1 hour data loss)
  • RTO: 4 hours (restore within 4 hours)
  • Daily backups: Database, configs, IaC
  • Monthly backups: Archive to cold storage (7-year retention)
  • Monthly restore tests for verification

Usage: Reference for backup planning and monitoring


2. Disaster Recovery Runbook

File: disaster-recovery-runbook.md

Purpose: Step-by-step procedures for disaster recovery

Content:

  • Disaster severity levels (Critical → Informational)
  • Initial disaster assessment (first 5 minutes)
  • Scenario-specific recovery procedures
  • Post-disaster procedures
  • Disaster recovery drills
  • Recovery readiness checklist
  • RTO/RPA targets by scenario

Scenarios Covered:

  1. Complete cluster failure (RTO: 2-4 hours)
  2. Database corruption/loss (RTO: 1 hour)
  3. Configuration corruption (RTO: 15 minutes)
  4. Data center/region outage (RTO: 2 hours)

Usage: Follow when disaster declared


3. Database Recovery Procedures

File: database-recovery-procedures.md

Purpose: Detailed database recovery for various failure scenarios

Content:

  • SurrealDB architecture
  • 8 specific failure scenarios
  • Pod restart procedures (2-3 min)
  • Database corruption recovery (15-30 min)
  • Storage failure recovery (20-30 min)
  • Complete data loss recovery (30-60 min)
  • Health checks and verification
  • Troubleshooting procedures

Scenarios Covered:

  1. Pod restart (most common, 2-3 min)
  2. Pod CrashLoop (5-10 min)
  3. Corrupted database (15-30 min)
  4. Storage failure (20-30 min)
  5. Complete data loss (30-60 min)
  6. Backup verification failed (fallback)
  7. Unexpected database growth (cleanup)
  8. Replication lag (if applicable)

Usage: Reference for database-specific issues


4. Business Continuity Plan

File: business-continuity-plan.md

Purpose: Strategic business continuity planning and response

Content:

  • Service criticality tiers
  • Recovery priorities
  • Availability and performance targets
  • Incident response workflow
  • Communication plans and templates
  • Stakeholder management
  • Resource requirements
  • Escalation paths
  • Testing procedures
  • Contact information

Key Targets:

  • Monthly uptime: 99.9% (target), 99.95% (current)
  • RTO: 4 hours (critical services: 30 min)
  • RPA: 1 hour (maximum data loss)

Usage: Reference for business planning and stakeholder communication


Key Metrics & Targets

Recovery Objectives

RPO (Recovery Point Objective):
  1 hour - Maximum acceptable data loss

RTO (Recovery Time Objective):
  - Critical services: 30 minutes
  - Full service: 4 hours

Availability Target:
  - Monthly: 99.9% (43 minutes max downtime)
  - Weekly: 99.9% (6 minutes max downtime)
  - Daily: 99.8% (17 seconds max downtime)

Current Performance:
  - Last quarter: 99.95% uptime
  - Exceeds target by 0.05%

By Scenario

ScenarioRTORPA
Pod restart2-3 min0 min
Pod crash3-5 min0 min
Database corruption15-30 min0 min
Storage failure20-30 min0 min
Complete data loss30-60 min1 hour
Region outage2-4 hours15 min
Complete cluster loss4 hours1 hour

Backup Schedule at a Glance

HOURLY:
├─ Database export to S3
├─ Compression & encryption
└─ Retention: 24 hours

DAILY:
├─ ConfigMaps & Secrets backup
├─ Deployment manifests backup
├─ IaC provisioning code backup
└─ Retention: 30 days

WEEKLY:
├─ Application logs export
└─ Retention: Rolling window

MONTHLY:
├─ Archive to cold storage (Glacier)
├─ Restore test (first Sunday)
├─ Quarterly audit report
└─ Retention: 7 years

QUARTERLY:
├─ Full DR drill
├─ Failover test
├─ Recovery procedure validation
└─ Stakeholder review

Disaster Severity Levels

Level 1: Critical 🔴

Definition: Complete service loss, all users affected

Examples:

  • Entire cluster down
  • Database completely inaccessible
  • All backups unavailable
  • Region-wide infrastructure failure

Response:

  • RTO: 30 minutes (critical services)
  • Full team activation
  • Executive involvement
  • Updates every 2 minutes

Procedure: See Disaster Recovery Runbook § Scenario 1


Level 2: Major 🟠

Definition: Partial service loss, significant users affected

Examples:

  • Single region down
  • Database corrupted but backups available
  • Cluster partially unavailable
  • 50%+ error rate

Response:

  • RTO: 1-2 hours
  • Incident team activated
  • Updates every 5 minutes

Procedure: See Disaster Recovery Runbook § Scenario 2-3


Level 3: Minor 🟡

Definition: Degraded service, limited user impact

Examples:

  • Single pod failed
  • Performance degradation
  • Non-critical service down
  • <10% error rate

Response:

  • RTO: 15 minutes
  • On-call engineer handles
  • Updates as needed

Procedure: See Incident Response Runbook


Pre-Disaster Preparation

Before Any Disaster Happens

Monthly Checklist (first of each month):

  • Verify hourly backups running
  • Check backup file sizes normal
  • Test restore procedure
  • Update contact list
  • Review recent logs for issues

Quarterly Checklist (every 3 months):

  • Full disaster recovery drill
  • Failover to alternate infrastructure
  • Complete restore test
  • Update runbooks based on learnings
  • Stakeholder review and sign-off

Annually (January):

  • Full comprehensive BCP review
  • Complete system assessment
  • Update recovery objectives if needed
  • Significant process improvements

During a Disaster

First 5 Minutes

1. DECLARE DISASTER
   - Assess severity (Level 1-4)
   - Determine scope

2. ACTIVATE TEAM
   - Alert appropriate personnel
   - Assign Incident Commander
   - Open #incident channel

3. ASSESS DAMAGE
   - What systems are affected?
   - Can any users be served?
   - Are backups accessible?

4. DECIDE RECOVERY PATH
   - Quick fix possible?
   - Need full recovery?
   - Failover required?

First 30 Minutes

5. BEGIN RECOVERY
   - Start restore procedures
   - Deploy backup infrastructure if needed
   - Monitor progress

6. COMMUNICATE STATUS
   - Internal team: Every 2 min
   - Customers: Every 5 min
   - Executives: Every 15 min

7. VERIFY PROGRESS
   - Are we on track for RTO?
   - Any unexpected issues?
   - Escalate if needed

First 2 Hours

8. CONTINUE RECOVERY
   - Deploy services
   - Verify functionality
   - Monitor for issues

9. VALIDATE RECOVERY
   - All systems operational?
   - Data integrity verified?
   - Performance acceptable?

10. STABILIZE
    - Monitor closely for 30 min
    - Watch for anomalies
    - Begin root cause analysis

After Recovery

Immediate (Within 1 hour)

✓ Service fully recovered
✓ All systems operational
✓ Data integrity verified
✓ Performance normal

→ Begin root cause analysis
→ Document what happened
→ Identify improvements

Follow-up (Within 24 hours)

→ Complete root cause analysis
→ Document lessons learned
→ Brief stakeholders
→ Schedule improvements

Post-Incident Report:
- Timeline of events
- Root cause
- Contributing factors
- Preventive measures

Implementation (Within 2 weeks)

→ Implement identified improvements
→ Test improvements
→ Update procedures/runbooks
→ Train team on changes
→ Archive incident documentation

Recovery Readiness Checklist

Use this to verify you're ready for disaster:

Infrastructure

  • Primary region configured and tested
  • Backup region prepared
  • Load balancing configured
  • DNS failover configured

Data

  • Hourly database backups
  • Backups encrypted and validated
  • Multiple backup locations
  • Monthly restore tests pass

Configuration

  • ConfigMaps backed up daily
  • Secrets encrypted and backed up
  • Infrastructure-as-code in Git
  • Deployment manifests versioned

Documentation

  • All procedures documented
  • Runbooks current and tested
  • Team trained on procedures
  • Contacts updated and verified

Testing

  • Monthly restore test: ✓ Pass
  • Quarterly DR drill: ✓ Pass
  • Recovery times meet targets: ✓

Monitoring

  • Backup health alerts: ✓ Active
  • Backup validation: ✓ Running
  • Performance baseline: ✓ Recorded

Common Questions

Q: How often are backups taken?

A: Hourly for database (1-hour RPO), daily for configs/IaC. Monthly restore tests verify backups work.

Q: How long does recovery take?

A: Depends on scenario. Pod restart: 2-3 min. Database recovery: 15-60 min. Full cluster: 2-4 hours.

Q: How much data can we lose?

A: Maximum 1 hour (RPO = 1 hour). Worst case: lose transactions from last hour.

Q: Are backups encrypted?

A: Yes. All backups use AES-256 encryption at rest. Stored in S3 with separate access keys.

Q: How do we know backups work?

A: Monthly restore tests. We download a backup, restore to test database, and verify data integrity.

Q: What if the backup location fails?

A: We have secondary backups in different region. Plus monthly archive copies to cold storage.

Q: Who runs the disaster recovery?

A: Incident Commander (assigned during incident) directs response. Team follows procedures in runbooks.

Q: When is the next DR drill?

A: Quarterly on last Friday of each quarter at 02:00 UTC. See Business Continuity Plan § Test Schedule.


Support & Escalation

If You Find an Issue

  1. Document the problem

    • What happened?
    • When did it happen?
    • How did you find it?
  2. Check the runbooks

    • Is it covered in procedures?
    • Try recommended solution
  3. Escalate if needed

    • Ask in #incident-critical
    • Page on-call engineer for critical issues
  4. Update documentation

    • If procedure unclear, suggest improvement
    • Submit PR to update runbooks

Files Organization

docs/disaster-recovery/
├── README.md                          ← You are here
├── backup-strategy.md                 (Backup implementation)
├── disaster-recovery-runbook.md       (Recovery procedures)
├── database-recovery-procedures.md    (Database-specific)
└── business-continuity-plan.md        (Strategic planning)

Operations: docs/operations/README.md

  • Deployment procedures
  • Incident response
  • On-call procedures
  • Monitoring operations

Provisioning: provisioning/

  • Configuration management
  • Deployment automation
  • Environment setup

CI/CD:

  • GitHub Actions: .github/workflows/
  • Woodpecker: .woodpecker/

Key Contacts

Disaster Recovery Lead: [Name] [Phone] [@slack] Database Team Lead: [Name] [Phone] [@slack] Infrastructure Lead: [Name] [Phone] [@slack] CTO (Executive Escalation): [Name] [Phone] [@slack]

24/7 On-Call: [Name] [Phone] (Rotating weekly)


Review & Approval

RoleNameSignatureDate
CTO[Name]_________
Ops Manager[Name]_________
Database Lead[Name]_________
Compliance/Security[Name]_________

Next Review: [Date + 3 months]


Key Takeaways

Comprehensive Backup Strategy

  • Hourly database backups
  • Daily config backups
  • Monthly archive retention
  • Monthly restore tests

Clear Recovery Procedures

  • Scenario-specific runbooks
  • Step-by-step commands
  • Estimated recovery times
  • Verification procedures

Business Continuity Planning

  • Defined severity levels
  • Clear escalation paths
  • Communication templates
  • Stakeholder procedures

Regular Testing

  • Monthly backup tests
  • Quarterly full DR drills
  • Annual comprehensive review

Team Readiness

  • Defined roles and responsibilities
  • 24/7 on-call rotations
  • Trained procedures
  • Updated contacts

Generated: 2026-01-12 Status: Production-Ready Last Review: 2026-01-12 Next Review: 2026-04-12