@ 1 Integration 1 milestones (think about when these will be completed by , add dependences as well):
* Timing env - all flows proven.
* Parsing constraints out of spec.
* Start with Summary script
* Web based to follow.
* DFT env - all flows proven.
* Getting started with Jbus .
* MBIST.
* Lbist.
* Scan insertion.
* Top Level
* Boundary scan.
* Lbist/MBIST/Scan
* Tap generation.
* Net-list generation.
* Cores
* Chip
* verif
* Equiv
* RTL to gates
* gates to gates
* Physical Design - all flows proven.
* Flow here (LSI flow running at Sun).
* DFT/ high fanout nets/Scan reorder
* Equiv.
* IO timing.
* Clocking.
* ECOs
* Synth Design - all flows proven
* Obtain RTL test cases of difficult physical designs from eagle.
* Push button synth for designers.
* Cores with logic test.
* Core without logic test.
* block level.
* Dual cores.
* Report automation.
* Directory structure.
* Vectors - all flows proven.
* Capture.
* Munge.
* Tester formating.
* Replay.
* DTL
* 3GIO
* Misc
* Power
* LSI
* DFT
* IDDQ
* Power
* RTL
* Gates
* Back-annotation
* Test(s)
* DFT Lbist wait states.
* Full tilt boogie
* Estar
2 Tomatillo full integration flow (Come up with dates/durations for the following and dependences).
* Synth/DFT insertion complete.
* Physical design complete.
* Timing flow complete (generated from LV).
* Simulation env (DFT test bench only)
* RTL
* Gates
* Back-annotation SDF's
* Equiv
* Power
3 Individual updates:
* DFT
* Synth
* PD
* Jbus
* IB
* Timing
* Top level/Hier
* Misc
@