syntaxis/docs/provision/quick-reference.md
Jesús Pérez 9cef9b8d57 refactor: consolidate configuration directories
Merge _configs/ into config/ for single configuration directory.
Update all path references.

Changes:
- Move _configs/* to config/
- Update .gitignore for new patterns
- No code references to _configs/ found

Impact: -1 root directory (layout_conventions.md compliance)
2025-12-26 18:36:23 +00:00

210 lines
5.5 KiB
Markdown
Raw Blame History

This file contains invisible Unicode characters

This file contains invisible Unicode characters that are indistinguishable to humans but may be processed differently by a computer. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# 🚀 Quick Reference - Gestión de Servicios
**Una página rápida para todo lo que necesitas saber**
---
## 🎯 El Sistema en 30 Segundos
```
Definición (TOML)
Validación (Rust)
Generación (Docker/K8s/Terraform)
Orquestación (Git/CI/CD)
```
---
## 📋 Las 3 Preguntas & Respuestas
### 1⃣ ¿Cómo se gestiona?
**Arquitectura centralizada de 4 capas** → Ver `MANAGEMENT_ORCHESTRATION.md`
### 2⃣ ¿Cómo abstraerlo para otros proyectos?
**Patrón ServiceRegistry reutilizable** → Ver `ARCHITECTURAL_ANALYSIS.md` (Q2)
### 3⃣ ¿Por qué no KCL directamente?
**Separación de concerns: TOML para servicios, KCL para infraestructura** → Ver `ARCHITECTURAL_ANALYSIS.md` (Q3)
---
## 🧭 Navegación Rápida por Rol
| Rol | Lee Primero | Luego | Acción |
|-----|-------------|-------|--------|
| **CTO/VP** | EXECUTIVE_SUMMARY | IMPLEMENTATION_ROADMAP | Aprueba/Rechaza |
| **Tech Lead** | IMPLEMENTATION_ROADMAP | MANAGEMENT_ORCHESTRATION | Planifica sprints |
| **Architect** | ARCHITECTURAL_ANALYSIS | MANAGEMENT_ORCHESTRATION | Valida diseño |
| **DevOps** | MANAGEMENT_ORCHESTRATION | DEPLOYMENT_GUIDE | Prepara infra |
| **Engineer** | ARCHITECTURAL_ANALYSIS (Q2) | IMPLEMENTATION_ROADMAP (Fase 1) | Implementa |
---
## 💰 El Caso de Negocio
```
INVERSIÓN: $70,000 (Año 1)
AHORROS: $28,500 - $57,000 (Año 1)
ROI: Breakeven mes 9
+300% en año 2+
BENEFICIO: -60% incidentes, 10x diagnóstico más rápido
```
---
## 🗓️ Timeline de 6 Meses
```
Fase 1 (3 sem) → Foundation (service-registry crate)
Fase 2 (3.5 sem) → Multi-proyecto (governance, policies)
Fase 3 (5.5 sem) → Observabilidad (monitoring, incidents)
Fase 4 (7 sem) → Avanzado (KCL, GitOps, multi-región)
Fase 5 (8 sem) → Production (DR, seguridad, training)
────────────────
Total: 27 semanas ≈ 6 meses
```
---
## 📚 10 Documentos Incluidos
### Strategy (Decisión)
1. **README.md** - Inicio rápido
2. **STRATEGIC_DOCUMENTS_INDEX.md** - Navegación
### Executive (CTO/VP)
3. **EXECUTIVE_SUMMARY.md** - Caso de negocio
4. **IMPLEMENTATION_ROADMAP.md** - Plan de ejecución
### Architecture (Técnico)
5. **ARCHITECTURAL_ANALYSIS.md** - 3 preguntas
6. **MANAGEMENT_ORCHESTRATION.md** - Operaciones
7. **INTEGRATION_COMPLETE.md** - Estado actual
### Operations (DevOps/Eng)
8. **CLI_TOOL_COMPLETE.md** - Referencia
9. **DEPLOYMENT_GUIDE.md** - Cómo desplegar
10. **ADVANCED_FEATURES.md** - Patrones
---
## ⚡ Comandos Clave
```bash
# Ver servicios disponibles
cargo run --example catalog-cli -- list
# Detalles de servicio
cargo run --example catalog-cli -- show <service-name>
# Validar catalog
cargo run --example catalog-cli -- validate
# Generar Docker Compose
cargo run --example catalog-cli -- generate docker production
# Generar Kubernetes
cargo run --example catalog-cli -- generate kubernetes production
# Ver patrones
cargo run --example catalog-cli -- patterns
# Ver puertos
cargo run --example catalog-cli -- ports
```
---
## 🔑 Conceptos Clave
| Término | Significado | Ubicación |
|---------|------------|-----------|
| **Service Registry** | Catálogo centralizado de servicios | ARCHITECTURAL_ANALYSIS |
| **Gestión Centralizada** | Control único de cambios | MANAGEMENT_ORCHESTRATION |
| **ServiceRegistry Trait** | Patrón reutilizable | ARCHITECTURAL_ANALYSIS (Q2) |
| **Validación Multi-Nivel** | 5 capas de validación | MANAGEMENT_ORCHESTRATION |
| **Deployment Patterns** | Combinaciones de servicios (4) | CLI_TOOL_COMPLETE |
---
## ✅ Checklist de Decisión
### ¿Aprobamos el proyecto?
```
□ Caso de negocio claro (ROI positivo)
□ Riesgos manejables
□ Recursos disponibles
□ Timeline aceptable
□ Stakeholders alineados
→ Si todos ✅: Aprobar y comenzar Fase 1
→ Si hay ❌: Revisar documento relevante
```
---
## 📊 Estado Actual vs. Objetivo
```
HOY OBJETIVO (Mes 6)
─────────────────────────────────────────────
✅ CLI tool ✅ + Multi-proyecto
✅ 3 generadores ✅ + Governance
✅ 34 tests ✅ + Observabilidad
✅ Prototipo ✅ + GitOps
✅ + DR procedures
```
---
## 🚨 Puntos Críticos
### Decisión 1: ¿TOML o KCL?
**Respuesta**: TOML para servicios (simple), KCL futuro (opcional)
**Documento**: ARCHITECTURAL_ANALYSIS.md (Pregunta 3)
### Decisión 2: ¿Centralizado o distribuido?
**Respuesta**: Centralizado (single source of truth)
**Documento**: MANAGEMENT_ORCHESTRATION.md
### Decisión 3: ¿Cuándo comenzamos?
**Respuesta**: Inmediatamente si aprobado (Fase 1 = 3 semanas)
**Documento**: IMPLEMENTATION_ROADMAP.md
---
## 📞 ¿Dudas? Consulta:
| Pregunta | Documento |
|----------|-----------|
| "¿Vale la pena?" | EXECUTIVE_SUMMARY.md |
| "¿Cuál es el plan?" | IMPLEMENTATION_ROADMAP.md |
| "¿Por qué esta arquitectura?" | ARCHITECTURAL_ANALYSIS.md |
| "¿Cómo operamos?" | MANAGEMENT_ORCHESTRATION.md |
| "¿Cómo uso la herramienta?" | CLI_TOOL_COMPLETE.md |
| "¿Cómo depliego?" | DEPLOYMENT_GUIDE.md |
| "¿Qué pasa si falla?" | MANAGEMENT_ORCHESTRATION.md (DR) |
---
## 🎯 Próximo Paso
1. Lee **README.md** (5 min)
2. Encuentra tu rol en **STRATEGIC_DOCUMENTS_INDEX.md**
3. Lee documento recomendado (15-40 min)
4. Haz preguntas o aprueba
5. Comienza Fase 1 ✅
---
**Última actualización**: 2025-11-20
**Versión**: 1.0
**Nivel**: Quick Reference
**Empieza en**: docs/provision/README.md